The structural design work concerned a building complex in Milan Bovisa for Superstudio Events, made up of six buildings with different types of intervention.
Works began in 2023. Two buildings required structural strengthening of vaults and roofs. One building was demolished and rebuilt with a new steel structure reaching a maximum height of about 16 metres.
Another building was reconstructed with a mixed reinforced-concrete and load-bearing masonry structure; a further building with load-bearing masonry and a composite roof system; and finally one existing building underwent seismic upgrading.
