Steel villa - Salsomaggiore Terme (PR)

Studio Capoferri handled the structural side of a steel residential building in Salsomaggiore Terme (PR), from the design stage through construction.

Poor ground conditions required a dedicated solution from the very beginning: a system of piled foundations defined from the early stages in line with the mixed reinforced-concrete and steel structure planned above ground.

Above the concrete base, with a partially buried lower floor and the stair core, rises the steel frame of the first floor and the roof, designed to accommodate a complete surface of photovoltaic panels.

  • Piled foundations

    a targeted solution for poor soil conditions.

  • Steel frame

    beams and columns defining the volumes with precision, strength and lightness.

  • Dry construction systems

    high-density mineral wool walls for execution speed and strong thermal performance.

  • Energy efficiency

    roof prepared for a full photovoltaic installation.

  • Integrated design

    services and finishes coordinated in parallel to reduce delays and on-site uncertainty.

For general contractors, see also structural engineers for general contractors in Italy.

A similar brief

The same kind of structure, or a comparable constraint.

Write to us